{"id":6305,"date":"2022-03-31T11:01:00","date_gmt":"2022-03-31T09:01:00","guid":{"rendered":"https:\/\/eqos-energie.com\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/"},"modified":"2023-01-23T18:11:54","modified_gmt":"2023-01-23T17:11:54","slug":"new-construction-of-catenary-line-system-in-ludwigshafen","status":"publish","type":"cases","link":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/","title":{"rendered":"New construction of catenary line system in Ludwigshafen"},"content":{"rendered":"<h2>Information<\/h2>\n<p>Due to its dilapidated condition, the elevated road \u201cHochstra\u00dfe S\u00fcd\u201d in Ludwigshafen had to be torn down. Rhein-Neckar-Verkehr GmbH (rnv) asked EQOS Energie to dismantle and reconstruct the existing catenary line system. A total of 14 new foundations with parallel wide-flanged beams were put in place, a dual line of rail built and 2,100 m of catenary wires installed. An electrical inspection concluded the project.<\/p>\n<p>The goal was a quick adjustment to the local infrastructural changes. Since the catenary lines ran underneath the street, they had to be dismantled in two stages to match the construction timeline for the affected roads and then connected to the new traffic routing. Speedy approval of the line was essential for resuming public transport as soon as possible.<\/p>\n<p>The catenary sections at Berliner Platz\/Mundenheimer Stra\u00dfe were constructed first. The missing system supports were replaced by parallel wide-flanged beams and their foundations. Due to high groundwater levels, block foundations were used. The new catenary system was constructed similar to the old one so that supply points would be roughly in the same spots. Continued use of adjacent supporting structures and existing masts was possible. One mast was fully eliminated in favor of a dual line of rail. Upon installation of the carrier cables and the electrical inspection of the system, public transport resumed.<\/p>\n<p>The remaining work was done in a second section at Berliner Stra\u00dfe toward Paul-Kleefod-Platz. Here, the remaining new foundations with masts were prepared, catenary wires installed across all of Berliner Stra\u00dfe and the project completed once the new system passed inspection.<\/p>\n<h2>The project<\/h2>\n<ul>\n<li>\n\t\t\t\t\t\t\t\t\t\tCustomer: Rhein-Neckar-Verkehr<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tLudwigshafen, Germany<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tPeriod of construction: June 2020 to December 2020<\/li>\n<\/ul>\n<h2>Overview of services<\/h2>\n<ul>\n<li>Dismantling of the existing catenary line system<\/li>\n<li>Construction of parallel wideflanged beams with block foundations<\/li>\n<li>Construction of a dual line of rail<\/li>\n<li>Electrical inspection of the catenary line system<\/li>\n<\/ul>\n<p><a data-hover=\"Contact the experts\" href=\"\/en\/contact\/\">Contact the experts <\/a><\/p>\n<h2>Project pictures<\/h2>\n<p><a href=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/04\/montagearbeiten-an-einer-fahrleitung.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"all-5e449a3\" data-elementor-lightbox-title=\"montagearbeiten-an-einer-fahrleitung\"><br \/>\n<\/a><br \/>\n<a href=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/04\/montagearbeiten-unter-einer-bruecke.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"all-5e449a3\" data-elementor-lightbox-title=\"montagearbeiten-unter-einer-bruecke\"><br \/>\n<\/a><br \/>\n<a href=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/04\/drei-maenner-bei-leitungspruefung.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"all-5e449a3\" data-elementor-lightbox-title=\"drei-maenner-bei-leitungspruefung\"><br \/>\n<\/a><br \/>\n<a href=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/04\/montagearbeiten-aus-einem-korb.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"all-5e449a3\" data-elementor-lightbox-title=\"montagearbeiten-aus-einem-korb\"><br \/>\n<\/a><br \/>\n<a href=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/04\/zwei-maenner-bei-montagearbeiten.jpg\" data-elementor-open-lightbox=\"yes\" data-elementor-lightbox-slideshow=\"all-5e449a3\" data-elementor-lightbox-title=\"zwei-maenner-bei-montagearbeiten\"><br \/>\n<\/a><\/p>\n<p style=\"text-align: center\">Would you like more details, literature or an offer?<\/p>\n<p>\t\t\t<a href=\"\/en\/contact\/\" role=\"button\"><br \/>\ngo to contact form<br \/>\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Information Due to its dilapidated condition, the elevated road \u201cHochstra\u00dfe S\u00fcd\u201d in Ludwigshafen had to be torn down. Rhein-Neckar-Verkehr GmbH (rnv) asked EQOS Energie to dismantle and reconstruct the existing catenary line system. A total of 14 new foundations with parallel wide-flanged beams were put in place, a dual line of rail built and 2,100&#8230;<\/p>\n","protected":false},"featured_media":3846,"parent":0,"menu_order":0,"template":"","cases_cat":[],"class_list":{"0":"post-6305","1":"cases","2":"type-cases","3":"status-publish","4":"has-post-thumbnail","5":"hentry","6":"nt-post-class","7":"","8":"masonry-item","9":"col-lg-4","13":"excerpt-none"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>New construction of catenary line system in Ludwigshafen - EQOS Energie<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"New construction of catenary line system in Ludwigshafen - EQOS Energie\" \/>\n<meta property=\"og:description\" content=\"Information Due to its dilapidated condition, the elevated road \u201cHochstra\u00dfe S\u00fcd\u201d in Ludwigshafen had to be torn down. Rhein-Neckar-Verkehr GmbH (rnv) asked EQOS Energie to dismantle and reconstruct the existing catenary line system. A total of 14 new foundations with parallel wide-flanged beams were put in place, a dual line of rail built and 2,100...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/\" \/>\n<meta property=\"og:site_name\" content=\"EQOS Energie\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-23T17:11:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/fahrleitungsanlage-ludwigshafen.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/new-construction-of-catenary-line-system-in-ludwigshafen\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/new-construction-of-catenary-line-system-in-ludwigshafen\\\/\",\"name\":\"New construction of catenary line system in Ludwigshafen - EQOS Energie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/new-construction-of-catenary-line-system-in-ludwigshafen\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/new-construction-of-catenary-line-system-in-ludwigshafen\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/02\\\/fahrleitungsanlage-ludwigshafen.jpg\",\"datePublished\":\"2022-03-31T09:01:00+00:00\",\"dateModified\":\"2023-01-23T17:11:54+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/new-construction-of-catenary-line-system-in-ludwigshafen\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/new-construction-of-catenary-line-system-in-ludwigshafen\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/new-construction-of-catenary-line-system-in-ludwigshafen\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/02\\\/fahrleitungsanlage-ludwigshafen.jpg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/02\\\/fahrleitungsanlage-ludwigshafen.jpg\",\"width\":1920,\"height\":768,\"caption\":\"EQOS installation de lignes ferroviaires Ludwigshafen\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/new-construction-of-catenary-line-system-in-ludwigshafen\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"New construction of catenary line system in Ludwigshafen\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\",\"name\":\"EQOS Energie\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#organization\",\"name\":\"EQOS Energie\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2021\\\/12\\\/eqos-logo-1.svg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2021\\\/12\\\/eqos-logo-1.svg\",\"width\":180,\"height\":79,\"caption\":\"EQOS Energie\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"New construction of catenary line system in Ludwigshafen - EQOS Energie","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/","og_locale":"fr_FR","og_type":"article","og_title":"New construction of catenary line system in Ludwigshafen - EQOS Energie","og_description":"Information Due to its dilapidated condition, the elevated road \u201cHochstra\u00dfe S\u00fcd\u201d in Ludwigshafen had to be torn down. Rhein-Neckar-Verkehr GmbH (rnv) asked EQOS Energie to dismantle and reconstruct the existing catenary line system. A total of 14 new foundations with parallel wide-flanged beams were put in place, a dual line of rail built and 2,100...","og_url":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/","og_site_name":"EQOS Energie","article_modified_time":"2023-01-23T17:11:54+00:00","og_image":[{"width":1920,"height":768,"url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/fahrleitungsanlage-ludwigshafen.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/","url":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/","name":"New construction of catenary line system in Ludwigshafen - EQOS Energie","isPartOf":{"@id":"https:\/\/eqos-energie.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/#primaryimage"},"image":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/#primaryimage"},"thumbnailUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/fahrleitungsanlage-ludwigshafen.jpg","datePublished":"2022-03-31T09:01:00+00:00","dateModified":"2023-01-23T17:11:54+00:00","breadcrumb":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/#primaryimage","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/fahrleitungsanlage-ludwigshafen.jpg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/fahrleitungsanlage-ludwigshafen.jpg","width":1920,"height":768,"caption":"EQOS installation de lignes ferroviaires Ludwigshafen"},{"@type":"BreadcrumbList","@id":"https:\/\/eqos-energie.com\/fr\/cases\/new-construction-of-catenary-line-system-in-ludwigshafen\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/eqos-energie.com\/fr\/"},{"@type":"ListItem","position":2,"name":"New construction of catenary line system in Ludwigshafen"}]},{"@type":"WebSite","@id":"https:\/\/eqos-energie.com\/fr\/#website","url":"https:\/\/eqos-energie.com\/fr\/","name":"EQOS Energie","description":"","publisher":{"@id":"https:\/\/eqos-energie.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eqos-energie.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/eqos-energie.com\/fr\/#organization","name":"EQOS Energie","url":"https:\/\/eqos-energie.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/eqos-energie.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2021\/12\/eqos-logo-1.svg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2021\/12\/eqos-logo-1.svg","width":180,"height":79,"caption":"EQOS Energie"},"image":{"@id":"https:\/\/eqos-energie.com\/fr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases\/6305","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases"}],"about":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/types\/cases"}],"version-history":[{"count":0,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases\/6305\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/media\/3846"}],"wp:attachment":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/media?parent=6305"}],"wp:term":[{"taxonomy":"cases_cat","embeddable":true,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases_cat?post=6305"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}