{"id":6306,"date":"2022-02-24T10:08:26","date_gmt":"2022-02-24T09:08:26","guid":{"rendered":"https:\/\/eqos-energie.com\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/"},"modified":"2023-01-23T18:12:06","modified_gmt":"2023-01-23T17:12:06","slug":"nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration","status":"publish","type":"cases","link":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/","title":{"rendered":"Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration"},"content":{"rendered":"<h2>Information<\/h2>\n<p>In the 175th anniversary year of the first railway line from Nuremberg to F\u00fcrth the largest-scale modernisation in the line\u2019s existence was begun. In the wake of the Nuremberg \u2013 Ebensfeld line and S-Bahn extension in Franconia, the line section between F\u00fcrth main station and F\u00fcrth \u2013 Vach was replanned. In addition, some of the existing overhead lines were completely renewed or installed on new track sections. he new overhead lines were installed at the same time as the track and structural work. The cross spans were completely renewed on the platforms at F\u00fcrth station.<\/p>\n<p>The aim was to set up S-Bahn operations between Nuremberg \u2013 Erlangen \u2013 Forchheim. A new S-Bahn track and all necessary adjustments in existing tracks were thus completed at F\u00fcrth station. The logistics had to be planned meticulously due to the fixed track cable and service intervals.<\/p>\n<p>Several types of foundation were required, including pile driving and drilling, in-situ concrete and rock-fill foundations due to different types of subsoil. The span masts on the open line were integrated into the noise barrier. Up to 60 fitters were simultaneously deployed to carry out the project.<\/p>\n<h2>The project<\/h2>\n<ul>\n<li>\n\t\t\t\t\t\t\t\t\t\tCustomer: transport company<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tNuremberg \u2013 F\u00fcrth, Germany<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tExecution period: January 2010 to December 2011<\/li>\n<\/ul>\n<h2>Overview of services<\/h2>\n<ul>\n<li>30 km line planning, incl. interim statuses<\/li>\n<li>170 foundations and poles, 8 km power line<\/li>\n<li>400 cantilevers, 35 multi-track cantilevers<\/li>\n<li>24 km of new overhead line, 6 km overhead line adaptation<\/li>\n<li>20 cross spans, dismantling of 10 cross spans<\/li>\n<\/ul>\n<p><a data-hover=\"Contact the experts\" href=\"\/en\/contact\/\">Contact the experts <\/a><\/p>\n<p style=\"text-align: center\">Would you like more details, literature or an offer?<\/p>\n<p>\t\t\t<a href=\"\/en\/contact\/\" role=\"button\"><br \/>\ngo to contact form<br \/>\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Information In the 175th anniversary year of the first railway line from Nuremberg to F\u00fcrth the largest-scale modernisation in the line\u2019s existence was begun. In the wake of the Nuremberg \u2013 Ebensfeld line and S-Bahn extension in Franconia, the line section between F\u00fcrth main station and F\u00fcrth \u2013 Vach was replanned. In addition, some of&#8230;<\/p>\n","protected":false},"featured_media":3809,"parent":0,"menu_order":0,"template":"","cases_cat":[],"class_list":{"0":"post-6306","1":"cases","2":"type-cases","3":"status-publish","4":"has-post-thumbnail","5":"hentry","6":"nt-post-class","7":"","8":"masonry-item","9":"col-lg-4","13":"excerpt-none"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration - EQOS Energie<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration - EQOS Energie\" \/>\n<meta property=\"og:description\" content=\"Information In the 175th anniversary year of the first railway line from Nuremberg to F\u00fcrth the largest-scale modernisation in the line\u2019s existence was begun. In the wake of the Nuremberg \u2013 Ebensfeld line and S-Bahn extension in Franconia, the line section between F\u00fcrth main station and F\u00fcrth \u2013 Vach was replanned. In addition, some of...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/\" \/>\n<meta property=\"og:site_name\" content=\"EQOS Energie\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-23T17:12:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/eisenbahnstrecke-nuernberg.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\\\/\",\"name\":\"Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration - EQOS Energie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/02\\\/eisenbahnstrecke-nuernberg.jpg\",\"datePublished\":\"2022-02-24T09:08:26+00:00\",\"dateModified\":\"2023-01-23T17:12:06+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/02\\\/eisenbahnstrecke-nuernberg.jpg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/02\\\/eisenbahnstrecke-nuernberg.jpg\",\"width\":1920,\"height\":768,\"caption\":\"EQOS ligne ferroviaire Nuremberg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\",\"name\":\"EQOS Energie\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#organization\",\"name\":\"EQOS Energie\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2021\\\/12\\\/eqos-logo-1.svg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2021\\\/12\\\/eqos-logo-1.svg\",\"width\":180,\"height\":79,\"caption\":\"EQOS Energie\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration - EQOS Energie","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/","og_locale":"fr_FR","og_type":"article","og_title":"Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration - EQOS Energie","og_description":"Information In the 175th anniversary year of the first railway line from Nuremberg to F\u00fcrth the largest-scale modernisation in the line\u2019s existence was begun. In the wake of the Nuremberg \u2013 Ebensfeld line and S-Bahn extension in Franconia, the line section between F\u00fcrth main station and F\u00fcrth \u2013 Vach was replanned. In addition, some of...","og_url":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/","og_site_name":"EQOS Energie","article_modified_time":"2023-01-23T17:12:06+00:00","og_image":[{"width":1920,"height":768,"url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/eisenbahnstrecke-nuernberg.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/","url":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/","name":"Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration - EQOS Energie","isPartOf":{"@id":"https:\/\/eqos-energie.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/#primaryimage"},"image":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/#primaryimage"},"thumbnailUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/eisenbahnstrecke-nuernberg.jpg","datePublished":"2022-02-24T09:08:26+00:00","dateModified":"2023-01-23T17:12:06+00:00","breadcrumb":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/#primaryimage","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/eisenbahnstrecke-nuernberg.jpg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/02\/eisenbahnstrecke-nuernberg.jpg","width":1920,"height":768,"caption":"EQOS ligne ferroviaire Nuremberg"},{"@type":"BreadcrumbList","@id":"https:\/\/eqos-energie.com\/fr\/cases\/nuremberg-fuerth-line-largest-scale-modernisation-since-inauguration\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/eqos-energie.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Nuremberg \u2013 F\u00fcrth line: Largest-scale modernisation since inauguration"}]},{"@type":"WebSite","@id":"https:\/\/eqos-energie.com\/fr\/#website","url":"https:\/\/eqos-energie.com\/fr\/","name":"EQOS Energie","description":"","publisher":{"@id":"https:\/\/eqos-energie.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eqos-energie.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/eqos-energie.com\/fr\/#organization","name":"EQOS Energie","url":"https:\/\/eqos-energie.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/eqos-energie.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2021\/12\/eqos-logo-1.svg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2021\/12\/eqos-logo-1.svg","width":180,"height":79,"caption":"EQOS Energie"},"image":{"@id":"https:\/\/eqos-energie.com\/fr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases\/6306","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases"}],"about":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/types\/cases"}],"version-history":[{"count":0,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases\/6306\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/media\/3809"}],"wp:attachment":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/media?parent=6306"}],"wp:term":[{"taxonomy":"cases_cat","embeddable":true,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases_cat?post=6306"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}