{"id":6315,"date":"2022-03-02T11:57:22","date_gmt":"2022-03-02T10:57:22","guid":{"rendered":"https:\/\/eqos-energie.com\/cases\/two-overhead-lines-into-one\/"},"modified":"2023-01-23T18:13:54","modified_gmt":"2023-01-23T17:13:54","slug":"two-overhead-lines-into-one","status":"publish","type":"cases","link":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/","title":{"rendered":"Two overhead lines into one"},"content":{"rendered":"<h2>Information<\/h2>\n<p>On behalf of a transmission grid operator EQOS Energie built a 380,000 V overhead line between the substations at G\u00fctersloh and Leopoldsh\u00f6he-Bechterdissen. It runs parallel to a 220,000 V overhead line to the Bielefeld-Ost substation.<\/p>\n<p>The project aimed at combining the new high-voltage and existing 110 kV lines. As the conversion project crossed a nearby motorway, the latter had to be closed twice for construction work. In the space of the two 15 minute traffic breaks the overhead fitters were able to dismantle and clip the wires from the poles.<\/p>\n<p>During the break the fitters had to take down 14 contact wires from the high voltage line between Pole 39 and 40, including an overhead earth wire as protection against direct bolts of lightning above the high voltage lines, and a fibre-optic cable. A total of 86 poles were dismantled and 48 newly erected. Work continued until October 2014 along the 15 kilometre route from Senne to Bechterdissen. In January 2015 the first section to the S\u00fcd substation was completed.<\/p>\n<h2>The project<\/h2>\n<ul>\n<li>\n\t\t\t\t\t\t\t\t\t\tCustomer: Transmission grid operator<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tG\u00fctersloh, Germany<\/li>\n<\/ul>\n<h2>Overview of services<\/h2>\n<ul>\n<li>70 km of overhead line construction<\/li>\n<li>9,400 m\u00b3 of concrete<\/li>\n<li>Dismantling of 86 poles<\/li>\n<li>Erection of 48 new poles<\/li>\n<li>385 km of new track cable<\/li>\n<\/ul>\n<p><a data-hover=\"Contact the experts\" href=\"\/en\/contact\/\">Contact the experts <\/a><\/p>\n<p style=\"text-align: center\">Would you like more details, literature or an offer?<\/p>\n<p>\t\t\t<a href=\"\/en\/contact\/\" role=\"button\"><br \/>\ngo to contact form<br \/>\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Information On behalf of a transmission grid operator EQOS Energie built a 380,000 V overhead line between the substations at G\u00fctersloh and Leopoldsh\u00f6he-Bechterdissen. It runs parallel to a 220,000 V overhead line to the Bielefeld-Ost substation. The project aimed at combining the new high-voltage and existing 110 kV lines. As the conversion project crossed a&#8230;<\/p>\n","protected":false},"featured_media":3786,"parent":0,"menu_order":0,"template":"","cases_cat":[],"class_list":{"0":"post-6315","1":"cases","2":"type-cases","3":"status-publish","4":"has-post-thumbnail","5":"hentry","6":"nt-post-class","7":"","8":"masonry-item","9":"col-lg-4","13":"excerpt-none"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Two overhead lines into one - EQOS Energie<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Two overhead lines into one - EQOS Energie\" \/>\n<meta property=\"og:description\" content=\"Information On behalf of a transmission grid operator EQOS Energie built a 380,000 V overhead line between the substations at G\u00fctersloh and Leopoldsh\u00f6he-Bechterdissen. It runs parallel to a 220,000 V overhead line to the Bielefeld-Ost substation. The project aimed at combining the new high-voltage and existing 110 kV lines. As the conversion project crossed a...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/\" \/>\n<meta property=\"og:site_name\" content=\"EQOS Energie\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-23T17:13:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/bielefeld-freileitung.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"678\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/two-overhead-lines-into-one\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/two-overhead-lines-into-one\\\/\",\"name\":\"Two overhead lines into one - EQOS Energie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/two-overhead-lines-into-one\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/two-overhead-lines-into-one\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/bielefeld-freileitung.jpg\",\"datePublished\":\"2022-03-02T10:57:22+00:00\",\"dateModified\":\"2023-01-23T17:13:54+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/two-overhead-lines-into-one\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/two-overhead-lines-into-one\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/two-overhead-lines-into-one\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/bielefeld-freileitung.jpg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/bielefeld-freileitung.jpg\",\"width\":1920,\"height\":678,\"caption\":\"EQOS Bielefeld construction lignes a\u00e9riennes\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/cases\\\/two-overhead-lines-into-one\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Two overhead lines into one\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\",\"name\":\"EQOS Energie\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#organization\",\"name\":\"EQOS Energie\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2021\\\/12\\\/eqos-logo-1.svg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2021\\\/12\\\/eqos-logo-1.svg\",\"width\":180,\"height\":79,\"caption\":\"EQOS Energie\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/fr\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Two overhead lines into one - EQOS Energie","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/","og_locale":"fr_FR","og_type":"article","og_title":"Two overhead lines into one - EQOS Energie","og_description":"Information On behalf of a transmission grid operator EQOS Energie built a 380,000 V overhead line between the substations at G\u00fctersloh and Leopoldsh\u00f6he-Bechterdissen. It runs parallel to a 220,000 V overhead line to the Bielefeld-Ost substation. The project aimed at combining the new high-voltage and existing 110 kV lines. As the conversion project crossed a...","og_url":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/","og_site_name":"EQOS Energie","article_modified_time":"2023-01-23T17:13:54+00:00","og_image":[{"width":1920,"height":678,"url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/bielefeld-freileitung.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Dur\u00e9e de lecture estim\u00e9e":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/","url":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/","name":"Two overhead lines into one - EQOS Energie","isPartOf":{"@id":"https:\/\/eqos-energie.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/#primaryimage"},"image":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/#primaryimage"},"thumbnailUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/bielefeld-freileitung.jpg","datePublished":"2022-03-02T10:57:22+00:00","dateModified":"2023-01-23T17:13:54+00:00","breadcrumb":{"@id":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/#primaryimage","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/bielefeld-freileitung.jpg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/bielefeld-freileitung.jpg","width":1920,"height":678,"caption":"EQOS Bielefeld construction lignes a\u00e9riennes"},{"@type":"BreadcrumbList","@id":"https:\/\/eqos-energie.com\/fr\/cases\/two-overhead-lines-into-one\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/eqos-energie.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Two overhead lines into one"}]},{"@type":"WebSite","@id":"https:\/\/eqos-energie.com\/fr\/#website","url":"https:\/\/eqos-energie.com\/fr\/","name":"EQOS Energie","description":"","publisher":{"@id":"https:\/\/eqos-energie.com\/fr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eqos-energie.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/eqos-energie.com\/fr\/#organization","name":"EQOS Energie","url":"https:\/\/eqos-energie.com\/fr\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/eqos-energie.com\/fr\/#\/schema\/logo\/image\/","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2021\/12\/eqos-logo-1.svg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2021\/12\/eqos-logo-1.svg","width":180,"height":79,"caption":"EQOS Energie"},"image":{"@id":"https:\/\/eqos-energie.com\/fr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases\/6315","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases"}],"about":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/types\/cases"}],"version-history":[{"count":0,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases\/6315\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/media\/3786"}],"wp:attachment":[{"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/media?parent=6315"}],"wp:term":[{"taxonomy":"cases_cat","embeddable":true,"href":"https:\/\/eqos-energie.com\/fr\/wp-json\/wp\/v2\/cases_cat?post=6315"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}