{"id":6269,"date":"2022-04-04T13:38:00","date_gmt":"2022-04-04T11:38:00","guid":{"rendered":"https:\/\/eqos-energie.com\/cases\/modernisation-of-the-lohhof-110-kv-substation\/"},"modified":"2023-01-23T17:59:08","modified_gmt":"2023-01-23T16:59:08","slug":"modernisation-of-the-lohhof-110-kv-substation","status":"publish","type":"cases","link":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/","title":{"rendered":"Modernisation of the Lohhof 110-kV substation"},"content":{"rendered":"<h2>Information<\/h2>\n<p>EQOS Energie implemented comprehensive upgrades of the Lohhof substation for Avacon AG. The substation is a single busbar with two transformer and line fields, each with busbar sections. EQOS Energie was responsible for a wide range of work processes such as planning and handling of all assembly work, installation of the field installation cables, remodelling of the secondary technology as well as inspection and commissioning of the substation.<\/p>\n<p>The modernisation ensures the long-term operational reliability of the substation and included updating it to state-of-the-art technology. The old protection and control technology was completely dismantled and rebuilt. The power distribution for the substation\u00b4s own needs was also completely modernised.<\/p>\n<p>The project was implemented in two phases of construction each of which involved one transformer. In order to facilitate sufficient power supply in the event of an emergency, EQOS Energie developed a special temporary solution for this remodeling project, which was used while the field instal-lation cables were installed. In each section, the required field installation cable was installed first and connected to the transformers with the help of the temporary solution. The obsolete devices were dismantled and retired and the new primary devices assembled and connected. The same was done with the secondary technology. EQOS Energie also connected the installation systems of the operating plant to the new power distribution for the building and exchanged all surge arresters and combined voltage transformers in the transformer fields. Finally, the complete control panels were subjected to a detailed functional and commissioning test before being handed over to the customer in its fully operational state.<\/p>\n<h2>The project<\/h2>\n<ul>\n<li>\n\t\t\t\t\t\t\t\t\t\tCustomer: Avacon AG<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tUchte, Germany<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tPeriod of construction: September 2019 to June 2020<\/li>\n<\/ul>\n<h2>Overview of services<\/h2>\n<ul>\n<li>Dismantling of old primary and secondary technology<\/li>\n<li>Installation of new primary and secondary technology in Avacon\u2019s operating plant<\/li>\n<li>Commissioning test<br \/>\nRenewal of the power supply for the substation`s needs<\/li>\n<li>Installation and connection of the field installation cables<\/li>\n<\/ul>\n<p><a data-hover=\"Contact the experts\" href=\"\/en\/contact\/\">Contact the experts <\/a><\/p>\n<p style=\"text-align: center\">Would you like more details, literature or an offer?<\/p>\n<p>\t\t\t<a href=\"\/en\/contact\/\" role=\"button\"><br \/>\ngo to contact form<br \/>\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Information EQOS Energie implemented comprehensive upgrades of the Lohhof substation for Avacon AG. The substation is a single busbar with two transformer and line fields, each with busbar sections. EQOS Energie was responsible for a wide range of work processes such as planning and handling of all assembly work, installation of the field installation cables,&#8230;<\/p>\n","protected":false},"featured_media":3830,"parent":0,"menu_order":0,"template":"","cases_cat":[],"class_list":{"0":"post-6269","1":"cases","2":"type-cases","3":"status-publish","4":"has-post-thumbnail","5":"hentry","6":"nt-post-class","7":"","8":"masonry-item","9":"col-lg-4","13":"excerpt-none"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Modernisation of the Lohhof 110-kV substation - EQOS Energie<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Modernisation of the Lohhof 110-kV substation - EQOS Energie\" \/>\n<meta property=\"og:description\" content=\"Information EQOS Energie implemented comprehensive upgrades of the Lohhof substation for Avacon AG. The substation is a single busbar with two transformer and line fields, each with busbar sections. EQOS Energie was responsible for a wide range of work processes such as planning and handling of all assembly work, installation of the field installation cables,...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/\" \/>\n<meta property=\"og:site_name\" content=\"EQOS Energie\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-23T16:59:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/umspannwerk-lohhof.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/modernisation-of-the-lohhof-110-kv-substation\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/modernisation-of-the-lohhof-110-kv-substation\\\/\",\"name\":\"Modernisation of the Lohhof 110-kV substation - EQOS Energie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/modernisation-of-the-lohhof-110-kv-substation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/modernisation-of-the-lohhof-110-kv-substation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/umspannwerk-lohhof.jpg\",\"datePublished\":\"2022-04-04T11:38:00+00:00\",\"dateModified\":\"2023-01-23T16:59:08+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/modernisation-of-the-lohhof-110-kv-substation\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/modernisation-of-the-lohhof-110-kv-substation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/modernisation-of-the-lohhof-110-kv-substation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/umspannwerk-lohhof.jpg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/umspannwerk-lohhof.jpg\",\"width\":1920,\"height\":768,\"caption\":\"EQOS Umspannwerk Lohhof\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/modernisation-of-the-lohhof-110-kv-substation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Modernisation of the Lohhof 110-kV substation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/\",\"name\":\"EQOS Energie\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/#organization\",\"name\":\"EQOS Energie\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2021\\\/12\\\/eqos-logo-1.svg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2021\\\/12\\\/eqos-logo-1.svg\",\"width\":180,\"height\":79,\"caption\":\"EQOS Energie\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Modernisation of the Lohhof 110-kV substation - EQOS Energie","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/","og_locale":"nl_NL","og_type":"article","og_title":"Modernisation of the Lohhof 110-kV substation - EQOS Energie","og_description":"Information EQOS Energie implemented comprehensive upgrades of the Lohhof substation for Avacon AG. The substation is a single busbar with two transformer and line fields, each with busbar sections. EQOS Energie was responsible for a wide range of work processes such as planning and handling of all assembly work, installation of the field installation cables,...","og_url":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/","og_site_name":"EQOS Energie","article_modified_time":"2023-01-23T16:59:08+00:00","og_image":[{"width":1920,"height":768,"url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/umspannwerk-lohhof.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Geschatte leestijd":"2 minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/","url":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/","name":"Modernisation of the Lohhof 110-kV substation - EQOS Energie","isPartOf":{"@id":"https:\/\/eqos-energie.com\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/#primaryimage"},"image":{"@id":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/#primaryimage"},"thumbnailUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/umspannwerk-lohhof.jpg","datePublished":"2022-04-04T11:38:00+00:00","dateModified":"2023-01-23T16:59:08+00:00","breadcrumb":{"@id":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/#primaryimage","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/umspannwerk-lohhof.jpg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/umspannwerk-lohhof.jpg","width":1920,"height":768,"caption":"EQOS Umspannwerk Lohhof"},{"@type":"BreadcrumbList","@id":"https:\/\/eqos-energie.com\/nl\/cases\/modernisation-of-the-lohhof-110-kv-substation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eqos-energie.com\/nl\/"},{"@type":"ListItem","position":2,"name":"Modernisation of the Lohhof 110-kV substation"}]},{"@type":"WebSite","@id":"https:\/\/eqos-energie.com\/nl\/#website","url":"https:\/\/eqos-energie.com\/nl\/","name":"EQOS Energie","description":"","publisher":{"@id":"https:\/\/eqos-energie.com\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eqos-energie.com\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/eqos-energie.com\/nl\/#organization","name":"EQOS Energie","url":"https:\/\/eqos-energie.com\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/eqos-energie.com\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2021\/12\/eqos-logo-1.svg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2021\/12\/eqos-logo-1.svg","width":180,"height":79,"caption":"EQOS Energie"},"image":{"@id":"https:\/\/eqos-energie.com\/nl\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/cases\/6269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/cases"}],"about":[{"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/types\/cases"}],"version-history":[{"count":0,"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/cases\/6269\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/media\/3830"}],"wp:attachment":[{"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/media?parent=6269"}],"wp:term":[{"taxonomy":"cases_cat","embeddable":true,"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/cases_cat?post=6269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}