{"id":6751,"date":"2022-03-02T12:01:26","date_gmt":"2022-03-02T11:01:26","guid":{"rendered":"https:\/\/eqos-energie.com\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/"},"modified":"2023-01-23T17:55:33","modified_gmt":"2023-01-23T16:55:33","slug":"construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg","status":"publish","type":"cases","link":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/","title":{"rendered":"Construction of a new 380 kV overhead line from Schwerin to Hamburg"},"content":{"rendered":"<h2>Information<\/h2>\n<p>The energy turnaround is advancing, especially in North Germany, where an increasing amount of wind power is generated. The aim is to build new power highways to bring renewable energy to consumers. Thus, as early as 2005, EQOS Energie was commissioned with all planning for the 75km long 380 kV overhead line from G\u00f6rries (Schwerin) to Kr\u00fcmmel (Hamburg).<\/p>\n<p>The aim was to support transport of renewable energy with the help of the new overhead line. Routing was based on data from an aerial laser scan. Data along the entire length of the planned route, a 500 -1,000 m corridor was captured and all possible variations explored. Intersection data was supplemented by terrestrial surveying. Data supplied by the relevant public agencies was also incorporated into the planning.<\/p>\n<p>Part of the project included the calculation and planning of the overhead line, drafting of documents for the planning permission hearings in Mecklenburg-Vorpommern and Schleswig-Holstein and initiation of the necessary soil expertises for the pole sites. The job also involved obtaining building permission from property owners and drafting of intersection documents on all surface and underground line systems. The company cooperated closely with the environment planning department to assess the impact on the environment and the necessary planning documents were drafted for interventions at tree and forest level. In the construction phase EQOS Energie was available as local point of contact for the required on-site plotting and on completion was also responsible for surveying and revision.<\/p>\n<h2>The project<\/h2>\n<ul>\n<li>\n\t\t\t\t\t\t\t\t\t\tCustomer: Transmission grid operator<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tSchwerin \u2013 Hamburg, Germany<\/li>\n<li>\n\t\t\t\t\t\t\t\t\t\tExecution period: September 2005 to April 2013<\/li>\n<\/ul>\n<h2>Overview of services<\/h2>\n<ul>\n<li>Calculation and planning of the overhead line incl. drafting of documents for the planning permission hearings<\/li>\n<li>Soil surveys of the relevant pole sites<\/li>\n<li>Drafting of all intersection documents for surface and underground line systems<\/li>\n<li>Local point of contact for on-site plotting<\/li>\n<li>Responsible for surveying and revision after completion<\/li>\n<\/ul>\n<p><a data-hover=\"Contact the experts\" href=\"\/en\/contact\/\">Contact the experts <\/a><\/p>\n<p style=\"text-align: center\">Would you like more details, literature or an offer?<\/p>\n<p>\t\t\t<a href=\"\/en\/contact\/\" role=\"button\"><br \/>\ngo to contact form<br \/>\n<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Information The energy turnaround is advancing, especially in North Germany, where an increasing amount of wind power is generated. The aim is to build new power highways to bring renewable energy to consumers. Thus, as early as 2005, EQOS Energie was commissioned with all planning for the 75km long 380 kV overhead line from G\u00f6rries&#8230;<\/p>\n","protected":false},"featured_media":3850,"parent":0,"menu_order":0,"template":"","cases_cat":[],"class_list":{"0":"post-6751","1":"cases","2":"type-cases","3":"status-publish","4":"has-post-thumbnail","5":"hentry","6":"nt-post-class","7":"","8":"masonry-item","9":"col-lg-4","13":"excerpt-none"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of a new 380 kV overhead line from Schwerin to Hamburg - EQOS Energie<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of a new 380 kV overhead line from Schwerin to Hamburg - EQOS Energie\" \/>\n<meta property=\"og:description\" content=\"Information The energy turnaround is advancing, especially in North Germany, where an increasing amount of wind power is generated. The aim is to build new power highways to bring renewable energy to consumers. Thus, as early as 2005, EQOS Energie was commissioned with all planning for the 75km long 380 kV overhead line from G\u00f6rries...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/\" \/>\n<meta property=\"og:site_name\" content=\"EQOS Energie\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-23T16:55:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/freileitung-hamburg-schwerin.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"678\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Geschatte leestijd\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minuten\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\\\/\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\\\/\",\"name\":\"Construction of a new 380 kV overhead line from Schwerin to Hamburg - EQOS Energie\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/freileitung-hamburg-schwerin.jpg\",\"datePublished\":\"2022-03-02T11:01:26+00:00\",\"dateModified\":\"2023-01-23T16:55:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\\\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\\\/#primaryimage\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/freileitung-hamburg-schwerin.jpg\",\"contentUrl\":\"https:\\\/\\\/eqos-energie.com\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/03\\\/freileitung-hamburg-schwerin.jpg\",\"width\":1920,\"height\":678,\"caption\":\"EQOS Fahrleitung Hamburg Schwerin\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/cases\\\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction of a new 380 kV overhead line from Schwerin to Hamburg\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/\",\"name\":\"EQOS Energie\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/eqos-energie.com\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of a new 380 kV overhead line from Schwerin to Hamburg - EQOS Energie","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/","og_locale":"nl_NL","og_type":"article","og_title":"Construction of a new 380 kV overhead line from Schwerin to Hamburg - EQOS Energie","og_description":"Information The energy turnaround is advancing, especially in North Germany, where an increasing amount of wind power is generated. The aim is to build new power highways to bring renewable energy to consumers. Thus, as early as 2005, EQOS Energie was commissioned with all planning for the 75km long 380 kV overhead line from G\u00f6rries...","og_url":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/","og_site_name":"EQOS Energie","article_modified_time":"2023-01-23T16:55:33+00:00","og_image":[{"width":1920,"height":678,"url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/freileitung-hamburg-schwerin.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Geschatte leestijd":"2 minuten"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/","url":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/","name":"Construction of a new 380 kV overhead line from Schwerin to Hamburg - EQOS Energie","isPartOf":{"@id":"https:\/\/eqos-energie.com\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/#primaryimage"},"image":{"@id":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/#primaryimage"},"thumbnailUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/freileitung-hamburg-schwerin.jpg","datePublished":"2022-03-02T11:01:26+00:00","dateModified":"2023-01-23T16:55:33+00:00","breadcrumb":{"@id":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/"]}]},{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/#primaryimage","url":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/freileitung-hamburg-schwerin.jpg","contentUrl":"https:\/\/eqos-energie.com\/wp-content\/uploads\/sites\/4\/2022\/03\/freileitung-hamburg-schwerin.jpg","width":1920,"height":678,"caption":"EQOS Fahrleitung Hamburg Schwerin"},{"@type":"BreadcrumbList","@id":"https:\/\/eqos-energie.com\/nl\/cases\/construction-of-a-new-380-kv-overhead-line-from-schwerin-to-hamburg\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/eqos-energie.com\/nl\/"},{"@type":"ListItem","position":2,"name":"Construction of a new 380 kV overhead line from Schwerin to Hamburg"}]},{"@type":"WebSite","@id":"https:\/\/eqos-energie.com\/nl\/#website","url":"https:\/\/eqos-energie.com\/nl\/","name":"EQOS Energie","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/eqos-energie.com\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"}]}},"_links":{"self":[{"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/cases\/6751","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/cases"}],"about":[{"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/types\/cases"}],"version-history":[{"count":0,"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/cases\/6751\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/media\/3850"}],"wp:attachment":[{"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/media?parent=6751"}],"wp:term":[{"taxonomy":"cases_cat","embeddable":true,"href":"https:\/\/eqos-energie.com\/nl\/wp-json\/wp\/v2\/cases_cat?post=6751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}